Building Permits in ZIP 10022
Manhattan, NY — 1,616 permits filed recently
1,616 permits
Removal of existing sprinkler and installation of temporary sprinkler loop on 20th floor as per drawings. no change to use, egress or occupancy.
Proposed garage repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Interior renovation of the duplex apartment associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Sprinkler/Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of work platform as per plans. no change in use, egress or occupancy.
Herewith file to convert from existing deli store to bagel store. work scope to include installation and rearragement of equipement as well as refinishing of floor and wall tiles. no change in use, eg...
Modifications to the existing plumbing system per plans filed herewith. No change in use, egress or occupancy.
Install ductwork and new air conditioning unit per plans.
Installation of temporary construction fence/enclosure system as per drawings. fence enclosure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application
Temporary hoist run-back structure during bldg alt, filed separately. hoist run-back structure shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this...
Installation of single cage 7000# capacity personnel/material hoist hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator application sub...
Renovation of existing office spaces on the 8th floor as per drawings filed herewith. no change to use, occupancy, or egress
Sprinkler/Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
Interior renovation of the duplex apartment associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
Temporary hoist run-back structure during bldg alt, filed separately. hoist run-back structure shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this...
Modifications to the existing plumbing system per plans filed herewith. No change in use, egress or occupancy.
Installation of work platform as per plans. no change in use, egress or occupancy.
Installation of single cage 7000# capacity personnel/material hoist hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator application sub...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.