Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Renovation of existing office space 1902 & 1903. install partitions, wall and floor finishes. no change of use, egress, or occupancy.
Concrete repair work at sub-cellar, cellar, first, and second floor as per plans. No change in use egress or occupancy.
Filing for interior renovation of 11th & 12th floor peerless clothing office space as per plans submitted herewith.
Filed herewith to renovate unit 3e as per plans, no change to use egress or occupancy.
Herewith filing Facade spot repair and roof repairs. No Change in use or egress.
Filing for limited exterior repairs. No change to egress, use, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural work to remove existing reinforcing steel from 23rd marketing floor (22nd Construction floor) for Common Fund space.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Sprinkler work for Common Fund on 22nd marketing floor (21st construction)
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for interior renovation of 11th & 12th floor peerless clothing office space as per plans submitted herewith.
Filing for limited exterior repairs. No change to egress, use, or occupancy.
Filed herewith to renovate unit 3e as per plans, no change to use egress or occupancy.
Herewith filing Facade spot repair and roof repairs. No Change in use or egress.
Structural work to remove existing reinforcing steel from 23rd marketing floor (22nd Construction floor) for Common Fund space.
Preparation Work for Full Demolition - Removal of Rooftop Equipment