Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.
Replacement (1) new gas fired hot water heater with integral burner in the sub-cellar. reconnect low pressure gas line, existing storage tanks. remove (1) boiler. no change in means of egress use grou...
Hereby filing for the removal, replacement, relocation and installation of fixtures in apartment 5a. no change to use occupancy or egress.
Filing for new plumbing work on the 6th Floor. No change to use, egress, or occupancy.
Plumbing work in apartment 3c in conjunction with apt renovation in dob now job#m01314103. no change in use, egress or occupancy.
General construction work is proposed in the existing unit #10F on the 10th floor. Subsequent plumbing and mechanical applications to be filed. All per submitted plans. No change to use, egress, or oc...
Hereby filing for the removal. replacement, relocation and installation of new plumbing fixtures in apartment 5c located on the fifth floor. no change to use occupancy or egress.
Herewith filing for Structural modifications as per plans. No change to use, egress or occupancy.
mechanical modifications throughout
Hereby filing for the removal, replacement, relocation and installation of fixtures in apartment 5a. no change to use occupancy or egress.
Renovate existing kitchen and master bathroom at Apt 9B. Minor interior non-bearing partitions and millwork. New drop ceilings. New thru-wall openings for AC condensing units.
Plumbing work in apartment 3c in conjunction with apt renovation in dob now job#m01314103. no change in use, egress or occupancy.
Replacement (1) new gas fired hot water heater with integral burner in the sub-cellar. reconnect low pressure gas line, existing storage tanks. remove (1) boiler. no change in means of egress use grou...
Provide new duct layout changes to the existing HVAC system in conjunction with Alt # M01343640 as per plans filed
Hereby filing for the removal. replacement, relocation and installation of new plumbing fixtures in apartment 5c located on the fifth floor. no change to use occupancy or egress.
Filing for new plumbing work on the 6th Floor. No change to use, egress, or occupancy.
Herewith filing for Structural modifications as per plans. No change to use, egress or occupancy.
General construction work is proposed in the existing unit #10F on the 10th floor. Subsequent plumbing and mechanical applications to be filed. All per submitted plans. No change to use, egress, or oc...
Replacement (1) new gas fired hot water boiler. (hallways) no change in means of egress use group or occupancy.
Mechanical work proposed in existing unit #9A on the 9th fl. Initial General Construction and subsequent Plumbing applications to be filed. All per submitted plans. No changes to use, egress, or occup...