Building Permits in ZIP 10023
Manhattan, NY — 1,038 permits filed recently
1,038 permits
Installation of a temporary overhead protection canopy as per plans. no change in use, egress or occupancy. overhead canopy to comply with 2014 nyc building code, chapter 33.
Mechanical work proposed in existing unit #9A on the 9th fl. Initial General Construction and subsequent Plumbing applications to be filed. All per submitted plans. No changes to use, egress, or occup...
Re-stain building entrance door, re-tile public hall and vestibule throughout, replace stone treads. nochange in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Facade repair as shown on plans. no changes to uses, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of Temporary Single Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
Interior renovation of apt 3b on the third floor. no change in use, egress or occupancy.
Installation of a temporary overhead protection canopy as per plans. no change in use, egress or occupancy. overhead canopy to comply with 2014 nyc building code, chapter 33.
General construction work proposed in existing unit #9A on the 9th fl. Subsequent Plumbing and Mechanical applications to be filed. All per submitted plans. No changes to use, egress, or occupancy und...
New, replaced, relocated and capped plumbing fixtures and/or appliances as per Plumbing Drawings.
Mechanical work proposed in existing unit #9A on the 9th fl. Initial General Construction and subsequent Plumbing applications to be filed. All per submitted plans. No changes to use, egress, or occup...
Facade repair as shown on plans. no changes to uses, egress or occupancy.
Re-stain building entrance door, re-tile public hall and vestibule throughout, replace stone treads. nochange in use, egress or occupancy.
Plumbing work including modification of fixtures, new fixtures, & waste and sanitary piping associated with the interior renovation of apartment #10c. no change to use, egress, or occupancy.
Inspection and Facade Repairs
Lady m--installation of plumbing fixtures as per plans filed.
Interior modification of unit 25a including the modification of the kitchen, bathrooms, and finishes throughout. no change in use occupancy or egress is proposed in this application
Plumbing work associated with the interior renovation of the kitchen area only in apartment #9a including modification of fixtures, drain, and water/ sanitary lines. no change to use, egress, or occup...