Building Permits in ZIP 10025
Manhattan, NY — 728 permits filed recently
728 permits
Install Illuminated LED Business Signs at Ground Floor entrance doors. No change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
cap and remove, relocate, replace and install plumbing fixtures in Apt. 812 on the 8th floor. GC filed under M
door and partition general construction work
Submit mechanical plan in conjunction with nb application #120090356.
Facade repairs and raising of parapet walls. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation and use temporary supported scaffolding as per plans filed herewith. no change to use, egress or occupancy under this application.
Facade repairs including limestone repairs and replacement, brick replacement, window sill replacement, cut and pointing at missing or deteriorated mortar joints, limestone sill replacements, cut and...
door and partition general construction work
Facade repairs and raising of parapet walls. No change in use, egress, or occupancy.
Facade repairs including limestone repairs and replacement, brick replacement, window sill replacement, cut and pointing at missing or deteriorated mortar joints, limestone sill replacements, cut and...
cap and remove, relocate, replace and install plumbing fixtures in Apt. 812 on the 8th floor. GC filed under M
Submit mechanical plan in conjunction with nb application #120090356.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Install Illuminated LED Business Signs at Ground Floor entrance doors. No change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation and use temporary supported scaffolding as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing herewith plumbing work in conjunction with building renovations as per plans.