Building Permits in ZIP 10025
Manhattan, NY — 728 permits filed recently
728 permits
Temporary shoring in-conjunction with full demo # m01310296-i1
Filing herewith plumbing work in conjunction with building renovations as per plans.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application for ll11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Install thru-wall AC units, associated GC work and components, as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith plumbing work in conjunction with building renovations as per plans.
Installation of medium duty pipe scaffold.
Temporary shoring in-conjunction with full demo # m01310296-i1
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Application for ll11/87 facade repairs as per plans here within. no change in use, occupancy, or egress.
Hereby filing for the combination of apartments 4 and 5 located on the fourth and fifth floor. no change to use occupancy or egress.
Renovation of Unit #22, including installation of air handler and associated ducts & piping, as per plans. No change to use, egress, or occupancy.
Plumbing work in association with Interior General Construction renovations to Unit 4BC. No change is Use, Egress or Occupancy under this application.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Kitchen, bathroom and one bedroom interior renovation of apt. #5f. no change of use, egress or occupancy.
General Construction for mechanical systems removal as shown on plans submitted herewith. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
Interior renovation of Unit #22, as per plans. No change to use, egress, or occupancy.