Building Permits in ZIP 10028
Manhattan, NY — 694 permits filed recently
694 permits
Installation of 3 hvac units with a total capacity of 14 tons on the fourth floor and roof. no change to egress, use, or occupancy.
Modification of existing plumbing system as per plans filedhereforth. no change in use, egress or occupancy.
Interior renovation as per plans filed herewith.
application filed for facade and roof repair as per drawing filed herewith. no change to use egress or occupancy as a part of this application.
INSTALLATION OF 300 psf SIDEWALK SHED PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Partial structural demolition and sequence plans.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress,or occupancy. the sidewalk shed is in front of the building at east 86th street elevation.
Structural work proposed for an existing penthouse. Localized reinforcement of existing steel beams, erection of new steel for new stair opening. No change to use, occupancy or egress.
Structural work proposed for an existing penthouse. Localized reinforcement of existing steel beams, erection of new steel for new stair opening. No change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress,or occupancy. the sidewalk shed is in front of the building at east 86th street elevation.
Proposed Interior renovation of existing apartment 3C on Third floor associated with minor plumbing work (under separate permit).No change in use ,occupancy or means of egress.
Proposed interior renovation of apartment #7w. remove partitions, doors, select millwork, and appliances. install new partitions, doors, refinish existing wood floor, new wall tile and floor in the ba...
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
Herewith filing for plumbing fixtures modification as per plans filed herewith. no change in use, occupancy or egress.
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
Proposed interior renovation of apartment #7w. remove partitions, doors, select millwork, and appliances. install new partitions, doors, refinish existing wood floor, new wall tile and floor in the ba...
Herewith filing for plumbing fixtures modification as per plans filed herewith. no change in use, occupancy or egress.
Proposed Interior renovation of existing apartment 3C on Third floor associated with minor plumbing work (under separate permit).No change in use ,occupancy or means of egress.
Scope of work includes support for infrastructure scope including demolition of newand infill of existing penetration through an existing foundation wall.
Plumbing work in connection with the interior renovation in the existing residential unit #11B. No change in use, occupancy or egress.