Building Permits in ZIP 10038
Manhattan, NY — 425 permits filed recently
425 permits
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
NYCHA BOILER_BLDG#11_Remove steam hot water storage tank and replace with new steam instantaneous water heater. Provide condensate piping from mechanical provided condensate pump to exist. bldg. drain...
Alt2 filed herewith for 8th floor interior alteration. scope to include new interior partitions, lighting and replacement of existing plumbing fixtures. no change in use, occupancy or egress
Filing to update the mechanical systems for the base building infrastructure as shown per plan. Please see comments for full description.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Subsequent filing of interior plumbing work in conjunction with dob#m01358323-i1 (gc: bubble tea shop). work includes installation of new pl fixtures(sinks) as per the plan herewith. no change in use,...
Renovate 2nd floor office space as per plans. no change in use, egrss or occupancy.
General construction as per plans filed herewith. no change to use egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
Plumbing legalization application for the removal of plumbing fixtures on floors 2-14.
Installation of new catwalk on the 5th floor and 6th floor. no change in use, egress or occupancy.
Plumbing legalization application for the removal of plumbing fixtures on floors 2-14.
Propose to perform interior renovations. No change in use, egress or occupancy.
Installation of new catwalk on the 5th floor and 6th floor. no change in use, egress or occupancy.
General construction as per plans filed herewith. no change to use egress or occupancy.
Herewith filing for interior renovation of restaurant on first floor as shown on drawings. work to be interior partition and door modification. no change to use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.