Facade repair.
Plumbing work at 7th floor at per plans filed herewith
Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
Update to existing sprinkler system at 7th floor as per plans filed herewith
DEMO HAUPT X-Ray/Fluoro: REMOVAL OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE X-RAY/FLUORO RENOVATION, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS...
plumbing work associated wth interior and exterior renovation of the apartment as shown on plans filed herewith. No change to use, egress or occupancy.
Application filed for mechanical upgrades as shown on plans.
Construction of interior partitions, doors and ceilings as shown on drawings. Removal of select non-structural demising walls. No change in use, egress or occupancy.
General construction work associated with the renovation of an existing 3rd floor apartment. There is no change to use, egress, or occupancy proposed.
F bldg sp ph3: sprinkler modifications to accomodate the sprinkler upgrades at the existinghospital building (f bldg.) as per plans. no change to use, egress or occupancy.
GP CT Simulator: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT SIMULATOR FIT OUT, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Replacement of Fan-coil unit in the cellar. Existing ductwork to remain. No change in use egress and occupancy.
Means & methods for structural alteration, filed in conjunction with m00945823-s4. includes phased selective demolitions of portions of levels & temporary shoring & bracing.
Interior renovation of an existing 5-story 1-family dwelling
DEMO HAUPT X-Ray/Fluoro: REMOVAL OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE X-RAY/FLUORO RENOVATION, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS...
General construction work associated with the renovation of an existing 3rd floor apartment. There is no change to use, egress, or occupancy proposed.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
GP CT Simulator: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT SIMULATOR FIT OUT, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Means & methods for structural alteration, filed in conjunction with m00945823-s4. includes phased selective demolitions of portions of levels & temporary shoring & bracing.