Building Permits in ZIP 10065
Manhattan, NY — 843 permits filed recently
843 permits
F bldg sp ph3: sprinkler modifications to accomodate the sprinkler upgrades at the existinghospital building (f bldg.) as per plans. no change to use, egress or occupancy.
Application filed for mechanical upgrades as shown on plans.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
DEMO HAUPT X-Ray/Fluoro: REMOVAL OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE X-RAY/FLUORO RENOVATION, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS...
General construction work associated with the renovation of an existing 3rd floor apartment. There is no change to use, egress, or occupancy proposed.
Replacement of Fan-coil unit in the cellar. Existing ductwork to remain. No change in use egress and occupancy.
Interior renovation of an existing 5-story 1-family dwelling
Interior renovation with repairing floor and partition for apartments. no change in use egress or occupancy
Gp2 endo update: plumbing modifications to accommodate the endo update, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Hereby filing for the interior renovation of existing apartment 8d located on the 8th floor. no change to use occupancy or egress.
Interior renovations with repairing floor and partitions for apartments. no change in use, egress or occupancy
Install new chimney liners and draft inducers as per plans. no change to use, occupancy or egress.
Interior renovation of apartment 19c as per plans filed herewith. no change in use, egress, or occupancy.
Parking garage repairs as per plans filed herewith. no change in use, egress, or occupancy
Plumbing work in apt 12c
Interior renovation with repairing floor and partition for apartments. no change in use egress or occupnacy
Modification of existing automatic wet sprinkler system by installing Temporary Sprinkler Loop and New Sprinkler Piping in existing commercial space (Carolina Herrera) on Cellar, 001 thru 003 Floors....
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 200 east 64 street, manhattan, ny 10065
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.