Building Permits in ZIP 10075
Manhattan, NY — 384 permits filed recently
384 permits
Iremoval of existing (10 ton) 4 ac systems and installation of new 2 multi zone ac system as per plans attached herewith. no change in use, egress and occupancy.
Renovation of an existing building at cellar, 1st floor thru 5th floor. No change in use, egress or occupancy under this application.
Installation of suspended scaffold for facade inspection/repair.
Renovation of an existing building at cellar, 1st floor thru 5th floor. No change in use, egress or occupancy under this application.
Iremoval of existing (10 ton) 4 ac systems and installation of new 2 multi zone ac system as per plans attached herewith. no change in use, egress and occupancy.
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
Replace existing storefront awnings. all copy on awnings filed under separate application # m00956135. no change in use, egress or occupancy
Installation of emergency heavy duty sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this...
Install non-illuminated copy on storefront awnings filed under separate application # m00956148. (flagstar)
Install non-illuminated copy on storefront awnings filed under separate application # m00956148. (flagstar)
Replace existing storefront awnings. all copy on awnings filed under separate application # m00956135. no change in use, egress or occupancy
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli...
Installation of emergency heavy duty sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this...
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of suspended scaffold for facade work or inspection.
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002-Option B
Filing for minor apartment renovation for apartment 2c as per plans
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Filing for minor apartment renovation for apartment 2c as per plans