Building Permits in ZIP 10302
Staten Island, NY — 110 permits filed recently
110 permits
Laundromat demolition. work includes remove exist'g washers, exist'g dryers, exist'g h.w. boiler w/ tanks, exist'g sprinkler heads.
Laundromat demolition. work includes remove concrete pads, non-bearing partitions, doors, duct work below roof and ceiling tile patch.
Application filed to install new gas fixtures at 1st floorcommercial space. no change to use, egress, or occupancy.
Plumbing Application in conjunction with G.C. Application.
No change existing first floor commercial space. existing vacant second-floor space convert use from 2 dwelling units to amend certificate of occupancy.
Plumbing Application in conjunction with G.C. Application.
No change existing first floor commercial space. existing vacant second-floor space convert use from 2 dwelling units to amend certificate of occupancy.
Interior renovation to an existin one story commercial building as per plans. no change is use, occupancy, or egress
Interior renovation to an existin one story commercial building as per plans. no change is use, occupancy, or egress
Two story horizontal addition to the existing two story building and convert the second floor to residential.
Partial removal of an existing two story located to the rear of the building and reconstruct a new larger two story addition in its place.
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
Partial removal of an existing two story located to the rear of the building and reconstruct a new larger two story addition in its place.
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
File an Alteration job with no work to correct the Air Condenser model and Serial Number data on the issued Certificate of Compliance..
Erection of a wood construction fence
Erection of a wood construction fence
1) installation of split-system heat pumps for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
Installation of photovoltaic solar array on existing roof system as per plans
1) installation of split-system heat pumps for heating and cooling. 2) installation of exhaust and erv systems for ventilation.