Building Permits in ZIP 10305
Staten Island, NY — 312 permits filed recently
312 permits
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Plumbing application filed in conjunction wtih nb for new building. applicable to house and garage.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Horizontal and vertical enlargement to existing 2.5 story 1-family residence. no change in use or occupancy
Installation of temporary construction fence with plastic barriers as per plan. no change in use, egress or occupancy.
Plumbing application filed in conjunction wtih nb for new building. applicable to house and garage.
Remove and provide new split systems air conditioning units with outdoor condensing units. Replacing refrigerant piping for air handing unit. Remove and replace penthouse.
P.S. 39-R: Storm: Removal and replacement of roof drain and existing areaway drains. Flow test of all storm drains and piping. Installation of new sump pump in cellar.
Remove and provide new split systems air conditioning units with outdoor condensing units. Replacing refrigerant piping for air handing unit. Remove and replace penthouse.
P.S. 39-R: Storm: Removal and replacement of roof drain and existing areaway drains. Flow test of all storm drains and piping. Installation of new sump pump in cellar.
Direct replacement of rooftop hvac units
Remove and provide new Roofing system, Roof barrier & coping. Repairing exterior masonry, repoining, face brick repair/replacement. Cut and removal of asphalt concrete pavement. Replacing air condense...
Direct replacement of rooftop hvac units
Remove and provide new Roofing system, Roof barrier & coping. Repairing exterior masonry, repoining, face brick repair/replacement. Cut and removal of asphalt concrete pavement. Replacing air condense...
Filing plumbing work type for an existing 2-story building. Remove piping for cast iron baseboard @ extension, replace existing 4 house trap & PVC main drain line. Remedy cure DOB ECB violation#391657...
Installation of new storm piping and water/sanitary work subsequent filing to general construction (gc) filing.
Installation of new storm piping and water/sanitary work subsequent filing to general construction (gc) filing.
Filing plumbing work type for an existing 2-story building. Remove piping for cast iron baseboard @ extension, replace existing 4 house trap & PVC main drain line. Remedy cure DOB ECB violation#391657...
Installation of new storm piping and water/sanitary work subsequent filing to general construction (gc) filing.
Installation of new storm piping and water/sanitary work subsequent filing to general construction (gc) filing.