Building Permits in ZIP 10306
Staten Island, NY — 346 permits filed recently
346 permits
Complete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be split system with air s...
Hand demo of existing one story building with cellar and removal of concrete steps to house on the north side of the house.
Propose to extend gravel driveway and perfom site work all as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 113 Grimsby Street - Lot 38, SI.
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 529 Greeley Avenue Lot - 1, SI.
Filed herewith; residential sprinkler plan
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 527 Greeley Avenue - Lot 3, SI.
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 529 Greeley Avenue Lot - 1, SI.
Installation of new plumbing fixtures for a detached two-family dwelling.
Installation of photovoltaic solar array on existing roof system as per plans.
Filed herewith; residential sprinkler plan
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 113 Grimsby Street - Lot 38, SI.
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Work Type NB 527 Greeley Avenue - Lot 3, SI.
Replace LP gas fired HW boiler
Hvac plan in conjunction with alteration to existing one family dwelling.
Interior renovation on 1st & 2nd floor of existing one-family dwelling. no change in use, egress, or occupancy.
Install 8' high temporary fence
Filed herewith; residential sprinkler plan
Filed herewith; residential sprinkler plan
Replace LP gas fired HW boiler