Partial demolition of nonconforming condition to remedy violation.
Replace and install gas and plumbing fixtures in the existing residential 1 story building, plumbing wors as per plan. no change in egress, use, or occupancy.
Application is filed for the construction of a 8'-0 high plywood temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under this applicat...
Remove ramp and access stair with two new stair access to boiler pit. Remove and Replace Concrete pads.
Remove and replace concrete pavement and subbase. install sheet membrane waterproofing at existing boiler pit. perform injection grouting at existing foundation wall
Renovation basement and 1st floor of existing 1 story building, repair partition, flooring and painting through out. demolition and construction work as per plan. no change in egress, use or occupancy...
Remove & Replace existing , Roofing systems, Parapets, bulkhead doors & Sills, steel lintels, windows,& guards. Repoint all masonry joints at all elevations, broken bricks replacement, replace Sealant...
Removal of vct tile. removal and replacement of louvers and screens, concrete steps, concrete ramp and guardrail. installation of handrail, concrete slab, egress hatch. painting, thermostats. removal...
Installation of new 10 foot curb cut in conjunction with proposed new single family residence
Application is filed for the construction of a 8'-0 high plywood temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under this applicat...
Remove & Replace existing , Roofing systems, Parapets, bulkhead doors & Sills, steel lintels, windows,& guards. Repoint all masonry joints at all elevations, broken bricks replacement, replace Sealant...
Remove and replace concrete pavement and subbase. install sheet membrane waterproofing at existing boiler pit. perform injection grouting at existing foundation wall
Renovation basement and 1st floor of existing 1 story building, repair partition, flooring and painting through out. demolition and construction work as per plan. no change in egress, use or occupancy...
Installation of new 10 foot curb cut in conjunction with proposed new single family residence
Removal of vct tile. removal and replacement of louvers and screens, concrete steps, concrete ramp and guardrail. installation of handrail, concrete slab, egress hatch. painting, thermostats. removal...
Remove ramp and access stair with two new stair access to boiler pit. Remove and Replace Concrete pads.
Resolve ecb violation: 39163022k; install new awning with canvas cover at store front reading health essential association as per plan. no change in use, egress, and occupancy.
Subsequent filing for st&fo work in conjunction with gc job#s01038536-i1.
Installation of photovoltaic solar array on existing roof system as per plans
Remove and replace the existing stucco Exterior Insulation and Finish System (EIFS) on all four sides of an existing two-family house. to address Violation # 39168923K