Building Permits in ZIP 10307
Staten Island, NY — 86 permits filed recently
86 permits
Legalize accessory masonry/shed 196.6 sf
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Alteration co for exist. 2-story & cellar one-family residence, including demolition of roof and partial interior demolition; horizontal enlargement at rear of 2nd floor, including interior renovation...
Temporary contruction fence.
Extend second floor over existing one-story portion of residence. extend attached garage to front.
Filed herewith for plumbing work fit out of existing restaurant space in conjunction to s01367349-i1. no change to use, occupancy, or egress under this application.
Exterior storm piping
Illuminated non-advertising accessory wall sign - in property lines - paris baguette. no change of use, egress or occupancy.
Full demolition of existing one-story garage.
Full demolition of existing one-story structure.
Filed herewith for mechanical work, including modifications to existing hvac ductwork, new walk-in box condenser and evaporator units, and new kitchen hood with associated ductwork. no change to use,...
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Plumbing worktype in conjunction with new 1-family residence w/ ancillary dwelling unit in basement filed under this application, to include storm and sanitary site drainage, water supply and interior...
Installation of photovoltaic solar array on existing roof system as per plans.
Application filed for temporary construction fence for demolition of structure on property
Temporary construction fence. no change to use, egress or ocuppancy under this application
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
legalization of horizontal and vertical enlargement of existing 1 family house , structural repair to remove violation for unsafe building