Building Permits in ZIP 10308
Staten Island, NY — 129 permits filed recently
129 permits
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Legalize existing LAARS Gas Fired Water Heater (MODEL#PWO715IN09K). Legalization scope of work is limited to the exist LAARS water heater's domestic and gas piping only. No change to use, egress or oc...
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Construct a two-family residence with accessory off-street parking for one car.
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
installation of solar panels, rooftop, railed, grid-tied, 16 modules, 6.56 kw
installation of solar panels, rooftop, railed, grid-tied, 16 modules, 6.56 kw
Plumbing work as per plan filed in conjunction with alteration
Plumbing work as per plan filed in conjunction with alteration
Legalize existing LAARS Gas Fired Water Heater (MODEL#PWO715IN09K). Legalization scope of work is limited to the exist LAARS water heater's domestic and gas piping only. No change to use, egress or oc...
File to address ECB violation# 39169470L, 39169471N, propose interior renovation work at cellar to retore back legal condition as per plan. No change in use, egress, or occupancy.
Legalize existing LAARS Gas Fired Water Heater (MODEL#PWO715IN09K). Legalization scope of work is limited to the exist LAARS water heater's domestic and gas piping only. No change to use, egress or oc...
File to address ECB violation# 39169470L, 39169471N, propose interior renovation work at cellar to retore back legal condition as per plan. No change in use, egress, or occupancy.
Installation of new fire sprinkler system with valves and meters for same.
Installation of new fire sprinkler system with valves and meters for same.
Installation of new fire sprinkler system with valves and meters for same.
Subsequent filing for support of excavation associated with the UST installation and use of mechanical construction equipment to lift, hoist and move material, earth and personnel on site.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.