Building Permits in ZIP 10314
Staten Island, NY — 544 permits filed recently
544 permits
Demolish detached garage. On-site and off-site fill not to exceed 300 cubic yards.
Installation of a 3-ton a/c unit at roof level. Make: York, Model #ZE03H10A2A..
temporary construction fence to protect occupants from construction and to store materials. 100% fence on property
Installation of new sidewalk shed at 275 westwood avenue, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of new sidewalk shed at 275 westwood avenue, staten island as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Full demolition of a 1 1/2-story residential structure
Installation of new plumbing and gas fixtures for a new one-family dwelling.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
To resolve ecb vio#39146891h by restoring illegal curb cuts to its prior legal condition filed under signed-off job #nb53-76. no change in use, egress, or occupancy.
Installation of new plumbing and gas fixtures for a new one-family dwelling.
Installation of new plumbing and gas fixtures for a new one-family dwelling.
Full demolition of a 1 1/2-story residential structure
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
To resolve ecb vio#39146891h by restoring illegal curb cuts to its prior legal condition filed under signed-off job #nb53-76. no change in use, egress, or occupancy.
In-kind replacement of (2) 5 ton 'trane' outdoor rooftop units and (1) 7.5 ton 'trane' outdoor rooftop units to sit on exist. dunnage on exist. roof of building 'a'
Demo. & Install HVAC Ductwork, Rooftop Unit Controls, Supply Air Diffusers & Registers, Return Air Grilles, Restroom Exhaust Fan & Duct Within Retail Space on Part of 2nd Fl. & Replace Existing HVAC R...
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 33 new pendent sprinkler heads in existing space
A new Construction of a 2 hour rated electrical room in the cellar.