Building Permits in ZIP 10458
Bronx, NY — 402 permits filed recently
402 permits
Interior renovation of existing one family and converting to two family house. obtain new c of o.
Plumbing & sprinkler filing in conjunction with Alteration I under job #240296041 and FN X00665935, ST X00667720 S1 , FO/EA X00667720, MC 00488838-l1
Plumbing & sprinkler filing in conjunction with AL application # 240296041 FN X00665935-l1 , FN ST X00718809- l1 , MC X00720036- l1 BPP 240319080
Plumbing & sprinkler filing in conjunction with AL application # 240296041 FN X00665935-l1 , FN ST X00718809- l1 , MC X00720036- l1 BPP 240319080
Plumbing & sprinkler filing in conjunction with Alteration I under job #240296041 and FN X00665935, ST X00667720 S1 , FO/EA X00667720, MC 00488838-l1
Interior renovation of existing one family and converting to two family house. obtain new c of o.
Installation of sidewalk shed for public protection during construction work
Installation of sidewalk shed for public protection during construction work
Temporary construction fence in-conjunction with full demolition and new residential development application. no proposed changed to use, egress or occupancy.
Party city space-- modifications to existing sprinkler and standpipe systems in conjunction with retail demise.
Temporary construction fence in-conjunction with full demolition and new residential development application. no proposed changed to use, egress or occupancy.
Minor renovation to existing bank branch including the construction of new full height partition to enclose private office. No change in use, egress or occupancy.
Temporary shoring and protection of delaminated concrete encasement of steel beams and delaminated slab undersides overhead.
Temporary shoring and protection of delaminated concrete encasement of steel beams and delaminated slab undersides overhead.
Installing new mechanical equipment, including but not limited to pumps, heat exchangers, control valves, expansion tank, and hot water system btu meter at walsh hall. nochange of use, egress or occup...
Installing new mechanical equipment, including but not limited to pumps, heat exchangers, control valves, expansion tank, and hot water system btu meter at walsh hall. nochange of use, egress or occup...
Installing new mechanical equipment, including but not limited to control valves and a hot water system btu meter at john mulcahy hall. no changeof use, egress or occupancy
Installation of new domestic hot water heater including new domesticwater piping. no change of use, egress or occupancy.
Direct replacment of 2 rooftop condensing units with a total capacity of 17.5 tons. no change to egress, use, or occupancy.
Installation of new domestic hot water heater including new domesticwater piping and installation of new natural gas piping. no change of use, egress or occupancy.