Building Permits in ZIP 10458
Bronx, NY — 392 permits filed recently
392 permits
Direct replacment of 2 rooftop condensing units with a total capacity of 17.5 tons. no change to egress, use, or occupancy.
Installing new mechanical equipment, including but not limited to control valves and a hot water system btu meter at john mulcahy hall. no changeof use, egress or occupancy
Alteration for Plumbing work related to the installation of new drinking fountains at the elevator lobby. No change of use or occupancy under this application.
Install Temporary Standpipe during construction of high rise building.
Replacing existing exterior exhaust duct/fan with new & installing new mua duct/fan at existing pizzeria. interior exhaust hood to remain undisturbed. no other work proposed. no change in use, egress...
Installation of two min-split system (two condensers, three air-handlers) to address fdny violation 14184024j as per plans filed.no change in use, egress or occupancy.
Filing for restoration
Install plumbing systems subsequent to GC (-I1) job.
Install Plumbing Systems subsequent to GC (-I1) job
Filing for restoration
Install Temporary Standpipe during construction of high rise building.
Installation of two min-split system (two condensers, three air-handlers) to address fdny violation 14184024j as per plans filed.no change in use, egress or occupancy.
Replacing existing exterior exhaust duct/fan with new & installing new mua duct/fan at existing pizzeria. interior exhaust hood to remain undisturbed. no other work proposed. no change in use, egress...
Alteration for Plumbing work related to the installation of new drinking fountains at the elevator lobby. No change of use or occupancy under this application.
Install Plumbing Systems subsequent to GC (-I1) job
Install plumbing systems subsequent to GC (-I1) job.
Install sprinkler and standpipe systems subsequent to GC (-I1) job.
Proposed construction fence. no change to use, egress or occupancy under this application.
Install Temporary Standpipe during construction of high rise building.
Install sprinkler and standpipe systems subsequent to the GC (-I1) job. The systems are hydraulically calculated.