Job filed cap and remove 3-piece bathroom at cellar as per plan to resolve ecb violation#39166094n. no change of use, egress, or occupancy under this application.
Proposed a new 3-story one-family detached residence. obtan a new certificate of occupancy.
Installation of foundation as per the plan filed herewith. no change in use, occupancy or egress.
Proposed installation of plumbing fixtures to be filed as subsequent in conjunction with primary gc application b01204639-i1; note: filed to complete work approved per expired alterations 321014424 an...
Renovation of existing cellar, 1st, 2nd floor and attic with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Install construction fence as per plans
General construction work in the 1st floor (ground floor) retail space to include removal and installation of partitions, doors, ceiling and finishes. No change to use, egress or occupancy is involved...
Application filed herewitth to obtain permit in order to resolve ecb violation# 39141040r for cut-out located at side of rear garage to install new glass sliding door at side of garage as shown on pho...
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 441 87th street.
Installation of suspended scaffold for facade work or inspection
Demolition and renovation of second floor of existing building. new steel-framed second floor structure at 470 86th street.
Proposed Interior renovation on existing partial first floor Commerical space as per plan. No change in USE, Egress or lot coverage.
Partial demolition of the interior partitions, Installation of new partitions, finished floor.
Installation of construction fence
Application filed for interior renovation and installation of mechanical systems in apartment apartments 1c, 2c, 3c and 4c from the first floor to the fourth floor of a multi-family building as per pl...
Proposed installing new gas and plumbing fixtures with new piping on exist. 2-story building. no change in use, occupancy and means of egress is involved under this application.
Stormwater drainage work is adding additional catch basins within the property limits to prevent future flooding. and does not increase the impervious area and all stormwater structures are connecting...
Interior renovations of units 2k and 3k on the second and third floors. work includes new non-structural interior partitions, replacement of existing plumbing fixtures, and interior finishes.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Install Temp system, piping and accessories, demo of piping, team control valve, steam traps, piping and insulation new equipment and accessories condensate return/feedwater, flush and lean radiators,...