Building Permits in ZIP 11236
Brooklyn, NY — 260 permits filed recently
260 permits
Suspended scaffold outrigger system for exterior inspection
Suspended scaffold outrigger system for exterior inspection
Restore existing garage as per C of O 196870. Remove illegal plumbing fixtures with no change of use, egress, or occupancy under this application.
Restore existing garage as per C of O 196870. Remove illegal plumbing fixtures with no change of use, egress, or occupancy under this application.
Installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.35kw
Filing plumbing work to comply with ecb violation: 39138840h + 39138841j. remove kitchen sink and file for 3-fixture bath in cellar. comply with buildings bulletin 2011-010.
Installation of refrigerant coolers as shown on plans in conjunction with b01084717-i1.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Filing plumbing work to comply with ecb violation: 39138840h + 39138841j. remove kitchen sink and file for 3-fixture bath in cellar. comply with buildings bulletin 2011-010.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.35kw
Installation of refrigerant coolers as shown on plans in conjunction with b01084717-i1.
Rooftop solar installation. no change to use, occupancy or egress.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Installation of plumbing fixtures and sprinkler heads as shown in plans filed herewith.
Demolish all existing mechanical systems & provide complete new HVAC system for new apartments and all BOH areas throughout the entire renovated building. No change in use, egress or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Installation of plumbing fixtures and sprinkler heads as shown in plans filed herewith.