Building Permits in ZIP 11237
Brooklyn, NY — 246 permits filed recently
246 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Cosmetic renovation of existing toilet facilities on 1st floor. no change to bathroom layout or fixture counts. no change to use, egress or occupancy.
Replacement of sheetrock throughout the cellar, first, and second floor. install the new dunage on the roof for the condensing units. there will be no change in use, occupancy, or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Cosmetic renovation of existing toilet facilities on 1st floor. no change to bathroom layout or fixture counts. no change to use, egress or occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Interior renovation existing restaurant with partition work at 1st floor. no change in use, egress or occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Interior renovation existing restaurant with partition work at 1st floor. no change in use, egress or occupancy.
phase 2
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
phase 2
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
Please assign to hub cdu per consultation on 2/18/26. structural work for installation of temporary av screen and platforms for temporary performance venue.
Supported Scaffold installation as per plans filed herewith.
Plumbing work as shown on plans.
Knuckleboom placement. this application involves no change in use, occupancy or egress.
Installation of 440 lf heavy duty sidewalk shed as per plans. no change in egress, use, or occupancy.
Installation of 440 lf heavy duty sidewalk shed as per plans. no change in egress, use, or occupancy.