Building Permits in ZIP 11249
Brooklyn, NY — 155 permits filed recently
155 permits
Installation of new curb cuts as per plans
Temp standpipe in conjunction with nb application b00975270-i1
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Propose to relocate existing sprinkler heads @ new hung ceiling with new concealed sprinkler heads
Foundation work in conjunction with nb application # b00975270-i1
Sprinkler system alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with full building renovation; related work as per plans.
Mechanical systems alteration. Ductless split system heat pumps no change in use, egress or occupancy.
The Alteration application is being filed for the plumbing work for the installation of new water connection with the RPZ backflow Preventer at the subject premises as per plans submitted herewith. Th...
This Alteration application is being filed for the installation of 3 fire service for the existing 2 story mixed commercial & residential building. There are no change to use, egress or occupancy.
Minor partition work at 1st floor and cellar, relocating bathroom at first floor, relocation egress of the commercial and residential creating new exterior openings in the commercial space. No change...
Hereby filing to relocate, replace, remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to install plumbing fixtures with related piping and electric storage water heater as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of suspended scaffold facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under this application.
Installation of suspended scaffold facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under this application.
Installation of suspended scaffold facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under this application.
Installation of suspended scaffold facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under this application.
Installation of suspended scaffold facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc bc. no change in use, egress or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Filing for facade restoration to resolve violation#111925cpi30101sb as per plans filed herewith. no change in use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola