Building Permits in ZIP 11373
Queens, NY — 300 permits filed recently
300 permits
Facade repairs as per the plans filed including: Removal & replacement of parapet, brick & stone masonry units, window lintels, expansion & window frame sealant. Repairs to spalled concrete, coping, s...
Q455_Extend and paint existing concrete equipment pad. Remove existing breeching with barometric hood, spill switch, motorized damper. Cap and seal stubout and top of vent. Proivde 2 thick 4LB panel i...
Install combined sprinkler/standpipe system as per plans filed.
Subsequence filing of plumbing work in-conjunction with OT. No change in use, egress & occupancy.
Construction Equipment for Full Building Demolition
Filing herewith for the demolition of existing ductwork and mechanical systems. Installation of new ductwork and mechanical systems.
Filing herewith for the demolition of existing ductwork and mechanical systems. Installation of new ductwork and mechanical systems.
Installation of structural work as per the plans filed herewith. no change in use, occupancy or egress.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed a new 3-story residence for 3-dwelling units. obtain a new certificate of occupancy.
Subsequent filing for plumbing & sprinkler work of a proposed 4 story mixed use residential & commercial building.
Subsequent filing for plumbing & sprinkler work of a proposed 4 story mixed use residential & commercial building.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of structural work as per the plans filed herewith. no change in use, occupancy or egress.
Carrier: VZW. Install (4) antenna sectors on the roof (16 antennas, 16 RRH, 4 OVP & 2 GPS). Install (3) cabinets on a new equipment platform on the roof. In conformance with TPPN #5/98. No change in u...
Installation of support of excavation and foundation work as per the plans filed herewith. no change in use, occupancy or egress.
Proposed a new 3-story residence for 3-dwelling units. obtain a new certificate of occupancy.
Temporary cantilevered platform, needle beam for adjacent overhead protection
Install temporary dry standpipe system during construction as per plans filed in conjunction with nb job# 421639980. no change in use,egress and occupancy.
Install temporary construction fence as shown on plan @ proposed construction site.