Building Permits in ZIP 55402
Minneapolis, MN — 61 permits filed recently
61 permits
T/I 17TH FLOOR const type: IA occupancy: B 2020 MSBC occupant load: 277 sprinklered: YES architect: 50737 - Ewert, Robert JohN
HVAC alterations include modifying the existing distribution system through the current air handling units, installing new fan-powered and VAV boxes to suit the new floor layout, i…
his is a 72-unit multi-family 8-story heat pump remodel/Addition. There will be 2 DOAS units: 1 with 4,800 CFM, 30 tons, and 576 MBH, and one with 3,100 CFM, 21 tons, and 330 MBH.…
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no const type: IA 2020 MSBC Tenant: Taft Floor(s): 1 architect: Mary Hustad
T/I - "LEVEL 19S REGULATORS" (19TH FLOOR) const type: IA occupancy: B 2020 MSBC occupant load: 199 sprinklered: YES architect: 52351 - Brown, Michael Tipton @ RSP
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Provide and install new sink, water connections to dishwasher and refrigerator. Provide and install new distribution piping to new fixtures - Cast iron waste and vent and soldere…
#1010 install electric water heater in break room
Demo existing plumbing fixtures and remodel plumbing layout & install (1) Drinking Fountain, (2) Urinals, (5)Lavs/ Faucets, (5) Toilets.
Install 3 transfer fans, relocated several diffusers and install 1 duct heater. BLDG1168869 South tower U.S. Bank levle19.
T/i suite 1340 & 1341 2020 msbc
ANTENNAS ON BUILDING Rated Exit Stair Enclosures are not allowed as a raceway for any of the installation 2020 Minnesota State Building Code
BLDG1163915 Rework existing duct systems from existing VAV's for office remodel on levels 25 and 26.
Remodel of 32nd floor common corridor, elevator lobby and restrooms certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occ…
Demo 3 existing suites including demising walls between suites -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occ…
Tenant Improvement of newly demised office -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 31 sprin…
Suite #3435 interior improvements certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 63 sprinklered: no Ten…
Remodel portions of floors 1 & 6 -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: A-3 2020 MSBC occupant load: 450 occupants at…
The project consists of the renovation of one floor of an existing high rise building -ACW certificate of occupancy required: no special inspections required: no const type: I-A oc…
Tenant Improvement - Colliers Mortgage - Floors 32, 33, & 34 certificate of occupancy required: no special inspections required: yes SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, P…
Install waste, vent & water for 1 toilet, 1 lav, 1 wellness sink, 4 break room sinks, 2 drinking fountain. Supply water to 2 ice makers, 2 coffee makers, Install 1 dishwasher.