Building Permits in ZIP 55402
Minneapolis, MN — 61 permits filed recently
61 permits
Interior remodel -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 94 sprinklered: yes Floor(s): 37t…
Supply and install plumbing for 1 break sink, 3 lavs, 3 water heaters, 1 drinking fountain, 1 toilet and connect appliances.
2 new bathrooms on 3rd floor for new ballroom
Suite 1400/Dishwasher, icemaker
Interior Remodel - 3rd Floor - Change Fitness Room to Ballroom certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL,…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
HCAC system, utilizing existing heat pumps system installing makeup air unit, exhaust fans, gas line, GRDs and all associated ductworks per approved plans.
office remodel - suite 2400. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _2/5/26_ arch…
install dishwasher in law office
add small conference room on 22nd floor. certificate of occupancy required: no const type:1a occupancy: b 2020 MSBC sprinklered: yes architect: Wold Architects
Level 18. interior demo only. no construction. no change to exiting or restrooms. (jjl) architect: bdh - jolene santema #59613
HVAC alterations include modifying the existing distribution system through the current air handling units, reusing existing and adding new fan-powered and VAV boxes to suit the ne…
T/I 'WINTHROP & WEINSTINE' - SUITE 3500 const type: IA occupancy: B 2020 MSBC occupant load: 835 (38 + 100 + 100 + 159 + 97 + 242 + 99, FLOORS 31 - 37) sprinklered: YES Floor(s): 3…
Install waste, vent & water, 1 RPZ, 2 water heaters, 4 break room sinks,1 drinking fountain, 3 glass fillers, 3 dishwashers, 6 toilets, 2 urinals & 6 lavs. All plumbing shall be in…
HVAC alterations include modifying the existing distribution system through the current air-handling units, reusing existing fan-powered and VAV boxes to suit the new floor layout,…
Plumbing for a restaurant remodel. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, f…
This is an 8 story remodel/new construction addition in downtown Minneapolis with 72 WC, 72-unit LAV's, 3 Common LAV's, 68 Tub SHW combos, 4 Handicap showers, 73 Kitchen sinks, 12…
Relocating supply diffuser and adding return air transfer duct per approved plan.
Complete new duct system for 11th floor space. Reuse and re-pipe VAV New mechanical to reconnect existing base building systems. Refer to plans for mechanical layout. BLDG1156402
Provide (3) new FPVAVs. Revise distribution on existing devices. Provide new GRDs per plans. BLDG1156061