Building Permits in ZIP 78701
Austin, TX — 250 permits filed recently
250 permits
Interior remodel of existing office space dividing full floor into new spec suite 220
Installation of a New Pool on the 16th floor.
Recover with 115MIL TPO Fleeceback.
Installation of a New Pool on the 16th floor.
2026/03/15 - 2026/03/18 | (2026/03/12) | (We order one outside 400sqft booth in SXSW2026 (show date: 12th-18th Mar) #SXSWAffiliated
*FKA 92 RED RIVER ST* ePlan: Expedited Review - First Time Finish Out for Spa FLR 73 (135 SF).
7 day finish out for an admin office
ePlan: Commercial Expedited Review - Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).
2026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | The project involves the temporary installation of window branding for an SXSW-related activation at the venue. The branding consists of adhesive...
Install illuminated individually mounted face-lit channel letters reading RENAISSANCE on North elevation
QT - Interior remodel with non structural kitchen and bathroom remodel in existing multi family residence - OVA
Install illuminated channel letters with raceway MOXIES east elevation
Install illuminated channel letters with raceway MOXIES Southeast elevation
Install illuminated individually mounted face-lit channel letters reading RENAISSANCE on South elevation
Install illuminated channel letters with raceway MOXIES south elevation
Test cx survey emails in prod
2026/03/12 - 2026/03/14 | (2026/03/11 - 2026/03/15) | Presented By Skybound Entertainment #SXSWAffiliated Invincible VS a new 3x3 tag fighter launching on April 30 2026 is appearing at SXSW with an ex...
Replace interior hot and cold water lines with Uponor PEX pipe & replace water heater **tub to shower conversion in one bathroom Express
Interior remodel - Spec Suite 2075
Secondary Mechanical Contractor 2 walk-ins a 3 refrigeration systems only for permit 2024-128964 BP