Building Permits in ZIP 78701
Austin, TX — 250 permits filed recently
250 permits
Express- Replace siding like for like replace drywall update fixtures update electrical box/panel replace HVAC adding insulation replacing windows and doors like for like.
Replacement of an existing water heater Swapping out electric water heater.
7 DAY renovation of existing interior space
Partial Renovation of Existing Interior Space for Suite 900
2026/03/12 - 2026/03/14 | (2026/03/10 - 2026/03/15) | KAP Media SXSW Projection Site for Fairmont image #SXSWAffiliated
Replacement of complete existing central heat and air system with or without duct work Replacement of new unit no ductwork needs to be done
Replacement of an existing water heater We are exchanging an electric tankless water heater for a new similar model
Replacement of an existing water heater Replacement of an existing water heater Replace 40-gallon electric water heater Located in closet Unit 915
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 3b - 1st floor Restroom Tenant Improvements (131364 SF Total)
7 day finish out for an admin office
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 4a - 5th Floor Office Tenant Improvements including New Interior Partitions for New Reception area and New Office (1313...
Interior remodel
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 4d -7th Floor Restroom Tenant Improvements (131364 SF Total)
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 4b - 5th Floor Restroom Tenant Improvements (131364 SF Total)
ePlan: Commercial Expedited Review - Remodel Two Bungalows- Scope of work to Include Exterior rehab Interior Demolition Addition to Include Connecting Bungalows into a Single Shell for Future Restaura...
Remove and replace sections of drywall for the retrofit installation of a new steel Fire Sprinkler system at Multifamily Property.
Interior remodel of existing office space dividing full floor into new spec suite 220
2026/03/13 - 2026/03/16 | (2026/03/02 - 2026/03/17) | 4 day public event featuring keynotes live music and other activations #SXSWAffiliated
7 DAY interior remodel existing basement mechanical areas
7 day finish out for an admin office