30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space
31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall...
42/fl- electrical engineered drawing. ref 202602196146
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.
ste 700: demo (e) ductowork as required. furnish and install vrf split systems, funrish and install: new ductwork, refrigerant piping, condensate drain, grilles, registers, diffusers. air balance.
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.
safe off controls vavs and ddc controls. reconfigure duct work to match new partition plan. furnish and install galvanized steel duct distribution. furnish and install grilles, registers, diffusers. c...
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.
43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings,...
ste 300 & 305 a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted
11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout
17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.
28th floor - revision to pa 202512172064 provide info for dph approved @ employee
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.
level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferred
6/fl- as built 202601073398- fire sprinklers updated drawing for adjusted piping plan. ref 202510087015
suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred.
17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new fi...
deferred mep for 27th floor office ti under permit 202512182090.
record as-built for bpa 202601073353 - fire sprinklers. update drawings for adjusted piping plan to add 15 sprinkler heads. ref pa 202507160945