Building Permits in ZIP 94104
San Francisco, CA — 149 permits filed recently
149 permits
4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permit
level 40: defered mep for bpa#202512172045
29th/f: deferred mep for t.i. 202512101397
4th fl, 450 deferred mep for bpa 202602196216
suite 350: mechanical work for t.i. ref pa#202511069032
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior buil...
basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair.
26/f: deferred mep for pa# 202512172035.
45/fl- temp wall only
2nd fl - title 24 lighting only. ref pa 202511210186
scope of work includes: selective demolition of non structural partitions, doors, glazing, ceiling, light fixtures and finishes. per ab-017. space will remain un-occupied. permit for construction and...
4th fl - title 24 lighting only. ref pa 202511059000
project scope is to renovate the 19th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out...
project scope is to renovate the 20th flr. of an (e) bldg to serve as a spec suite showroom for a future business occupancy tenant. scope of work includes, selective demolition of (e) interior fit out...
24-25/f: deferred mep for pa# 202512172034.
10/f: deferred electrical upgrade to permit 202602276645
demo of single wall ust and temporary remote fill to serve existing day tanks only. a future period will be obtained to install a replacement double wall ust
ste 870-876-ti. include demo of non structural partitions and ceiling. scope includes construction of new partitions, ceiling, power & finishes. seperate permits for fire/lifesafty/fire sprklr/mep
suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for marketing of vacant st...
l45-46 interconnecting stair. new finishes & banquette platform landing