Building Permits in ZIP 94107
San Francisco, CA — 261 permits filed recently
261 permits
renewal of fire sprinkler fire only permit pa 202203018904 for final inspection. all work complete.
revision to pa #2025-0210-0064: relocate and modify deli equipment.
fire alarm for an elevator modernization of 3 traction elevator, 1,2,3, as well as 1 hydroulic elevator #4. relay modules will be added for alternate recall, primary recall, shunt trip and the elevato...
cripple wall bracing @ ground floor i.e. bolt foundation w 5/8" tr @ 7" min embedment @ 48" max spacing. add 1/2 struc 1 plywood nail 6" edge 12" field. plywood over portions of cripple walls, min. 50...
exterior wall repair to comply w/ nov 202539215 will not affect public right of way
1st fl interior ti: non structural interior walls & ceiling in office area. mep deferred
asbestos abatement for demolition permit application #202502140421 and 202502140427, baaqmd, j#asb144797.
raise roof of (e) 3/f & add bathroom. convert 2/f bath to office, relocate laundry, remodel half-bath and add tub. reinforce g/f retaining walls.
1. remove bathtub and replace w/ standing shower(in-place) 2. replace tiles 3. replace old fixtures
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.
submittal to plumbing inspection division for adminstrative review of stormwater control plans associated with sfpuc storm water control plan.
ti for partial demo of (e) doors, partitions, ceiling, lighting, electrical and tel/data receptacles, stairs and finishes at both floors of a two story low rise office building. construction of (n) pa...
solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | powerwall 13.5kwh ( 1 ess )
replace 9 windows, 6 street facing, 3 non street facing, like for like. (e) wood, 9x double hung (n) fibrex - 9x double hung. no size change. all windows are in kind u factor <.27.
replacing e) ests facp w/ est4. replace e) remote annuciator w/ new & e). telguard communicator. voluntary upgrade
fire alarm control panel upgrade. replacing est2 to est4. installing new napco starling and 1 input modules.
reroofing no hot works
to obtain final inspection for work approved under pa 201609066801. all work is complete.
demo 733 sq ft of shingles and install 735 sq ft of shingle, hot work.