Building Permits in ZIP 94108
San Francisco, CA — 147 permits filed recently
147 permits
demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.
recommencement and completion of work approved under pa# 201801269697
repair stair landing due to dryrot back of bldg, less than 50%, non street visible. repair and repalce guardrail two pieces on roof.
2 new 24' speaker poles/footing at stage steps. new storage closet in (e) storage room @ garage level 1.
unit #307: replacement of two windows on the third floor, in the back of the building with two new single hung, double panel windows. no changes in size, design, and location, in-kind. not st visible.
renovation of commercial kitchenm restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passagaway & alteration to utilities serving the area to be renovated
unit 504: upgrade of interior finishes. new paiont, modings, door styles, refinish floors, new countertops and new recessed led lighting.
unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work.
fire alarm system upgrade to comply with sffc 1103.7.6.1 in partially sprinklered building.
fire alarm system upgrade to comply with sffc 1103.7.6.1.
4/f: selective demolition of interior office space to remove millwork, doors, frames,side lights, lighting and ceilings. ab017.
standpipe will stay interior and shift 10" over.sprinklers existing dry. as-built for permit ref#: 202601143794.
iron gate > amnesty program: legalize roll-gate; metal roll-down gate installed before 2023 with motor.
project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent cha...
3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017
3rd/f mep for t.i. 202510147260: mep for project
unit 304; remodel (e) 1 kitchen, remodel (e) bathroom, install washer/dryer.
21/f: add sprinkler coverage to existing phone pods in office. total 7 pendent sprinklers added. pa# 202601153979
partial interior demolition at previuos tenant improvement on basement, ground floor and intermidiate levels in preparations for planet fintness, including removal of interior wall partitions, lights,...
21/fl- revision 202511189893- add 3 (n) phonebooths, fire sprinkler and alarm submittal deferred