Building Permits in ZIP 94111
San Francisco, CA — 223 permits filed recently
223 permits
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.
7th floor: revision to 202602095508: relocate 21 ssu, convert 11 ssu to ssp, added 6 ssu. gct#202512030811
comply with 202425065: patch/install drywall ceiling in 1st fl and basement. patch missing flooring in 1st fl and basement. remove basement wall, non load bearing.
22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and light fixtures only. ti will be on separate permit
11/f suite 1100: interior tenant improvement. installation of (4) new furniture pods. structural anchoring and reinforcement.
39/f: fire only work to add 1 2-way communication system call station. no associated remodel work or building permit number.
change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per w...
revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct
renew request for 202407186784.
revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: column all 4 sides to...
install 3 evacuation maps on 28th floor.
deferred mecha and electrical permit. ref 202511058945. mech selective demo and cap of med to low pressure ductwork. new dist for vav bxes, new hot water reheat dist piping. air balance. elec new powe...
deferred mech and elec permit. ref pa# 202511058944. mech: select demo and cap of mep to low pressured ducktwork.new dist for vav boxes, new hot water reheat distrubtion piping. air balance elec and n...
12th floor: deferred mech + elec permit. permit ref # 202511058940. mech selective demo + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping...
9th flr: suite 925: mech + electrical for 202512051085
as-built ti: add (6) smoke detectors and (4) duct detectors. arch ref# 202510036672
adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbing
27/f- as-builts: install (1) 2 way comm call station with signage. arch ref# 201805189519.
renew 202501037686 and 202302061437
16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377