Building Permits in ZIP 94111
San Francisco, CA — 223 permits filed recently
223 permits
unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.
revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.
7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for permit separtely. b...
interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electric...
unit 2209; rehabitlitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
11th fl - deferred mech & elec permit. permit ref pa 202510238040 mech selective demo & cap of med & low pressure duct work, ew dist for vav boxes, new hot water. reheat dis piping wshp & assoc ductwo...
ste 750: deferred mech + elec permit. ref # 202510237987. mech select demo + cap of mep to low pressure duct work. new dist for vav boxes, new hot water reheat dist piping. ohr balance. elec new power...
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting
16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and...
24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical.
6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately
basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.
deferred submittal for 202512151771 for cold form steel framing.
revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.
basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping)
28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.
prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements.
install (1) non-illuminated wall sign: "fidelity investments"
8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenan...
the fabrication and installation of 8 acrylic evacuation maps for 13th and 14th floors.