Building Permits in ZIP 94111
San Francisco, CA — 219 permits filed recently
219 permits
renovate existing bathroom, new fixtures, new lighting, new tile, no structural work.
(1) illumintaed blade sign, double face, sign "rho".
reroofing no torch, carlesle syntec system/fleeceback tpo - solar reflectance 0.70, thermal emittance 0.90, solar reflectance index 99
seismic alteration and removal of existing mezzanine the building is vacant, accessiblity under ab-017.
level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and...
28/f - ste #2820: mechanical and electrical (deferred). ref pa# 202512051088
5/fl- install (3) furntiure privacy phone booths at open office area within (e) occupied office suite. no change to the floor area or mep work.
installation of 3 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included.
20th & 21st fl ref pa #2025-0924-6061: fire sprinkler ti; relocate 72 uprights and 12 concealed pendents on the 20th fl & relocate 82 uprights and 21 concealed pendents on the 21st fl.
#304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.
unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
#809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
4th fl - ti include demo of non-structural partitions and building new non-structural partition. all new or revised. meps and life safety work will be design build and submitted separately. (bldg is f...
new fire smoke dampers and power ref approved mech permit: 202602236308.
15th fl - provide new lighting @ ste 1500 ref pa 202510026577
31/f: fire alarm - tenant improvement - as built. per sffd walling comment on building job card pa# 202508203550 & fire permit 202510157411. as built drawing are needed, with the av shutdown relay & s...
installation of a mechanical service access platform and stairs in the street level fan room
26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhau...
revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associate...
2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included