Building Permits in ZIP 94111
San Francisco, CA — 219 permits filed recently
219 permits
reroof 2300 sq ft tear off, install polyglass, hot work permit#126727
6th, 9th, & 16th floors:office building common restroom lighting remodel: lighting fixtures and associated circuiting/controls. ref. arch permit: 202505055757
ste 206-ref 202512302986- rework low side air distribution and air balance area of work.
convert 1 upright to pendent. gc 202512111504
3/f: deferred mep for pa# 202509306379.
1st/f - revision to 202508012119. remove of (e) pair doors and finishes, (n) pair 20-minute rated doors, adjust (e) light fixture and (n) finishes.
to obtain final inspecion for work approved under pa #2024-1126-5763. all work is complete.
connecting stairs, prefabricated, connects 2 levels of existing office. ref pa #202507150851
34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096
fire only work for the 13/f. remodel done uner pa# 202508112754; additions are 17 s/d, 1 d/d, 4 pull stations, 3 modules, 50 speakers, 38 speaker/strobes, and 3 strobes.
19th fl: partial ti revision to 202509044565.deferred clarification to dph for use of butler pantry area 19303. removal of pantry equipment from scope.
14/f: fire only work for the remodel done under permit 202508082665. additions are 23 smoke detectors, 1 duct detector, 4 pull stations, 12 modules, 47 speakers, 42 speaker/strobes, and 2 strobes.
scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada...
14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking foun...
12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking foun...
1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.
13/14/fl-install (4) bath2400-808nspm with mushroom button. ref 202508112754 and 202501905013
basement -expansion and remodel of (e) basement gym
install like for like insulation & 5/8 drywall due to 2 foot flood cut in entry way. kitchen, hallway & re-install 1 kitchen cabinet. approx 275 sq. ft. of type x drywall.