Building Permits in ZIP 94111
San Francisco, CA — 221 permits filed recently
221 permits
18/fl- ref 202512111506- deffered engineering scope for ti meps
the interior scope consists of demolishing the existing 2nd floor shaft and duct work and infilling the associated deck opening.
deferred mep for 202408198960 and 202408198963 and revision to bpa#'s 202408198960 and 202408198963
2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts.
25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light,...
16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons,...
existing cafe to be remodeled at ground floor. a new accessible toilet, all work is limited to inteiror of suite# 103 only. modify (e) partition walls. electrical and mechanical existing to remain unl...
interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison fo...
2nd fl - add 11, relocate 16 change out 3 fire sprinkler ti ref 202512020740
17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.
9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated...
7th floor. relocate (31) uprights. convert (23) uprights to pendents. convert (2) uprights the pendents. gcti# 202512030811
ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274
unit#1312: one kitchen, one bathroom,remodel in kind like for like
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.
remove portions of the existing embarcadero fountain located in embarcadero plaza, including the precast concrete tube elements ("arms").
unit #1406: one kitchen, one bathroom. remodel in kind like for like.
unit #304: one kitchen, one bathroom. remodel in kind like for like.
unit #702: one kitchen, one bathroom. remodel in kind like for like.
tenant improvement on the 7th floor to include new non-structural partitions, acoustical ceiling, finishes, millwork, single user restroom. mep included.