7th fl relocate 35 pendents ref pa 202510237987
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
28th fl ref pa #2025-1003-6672: fire alarm ti. demo 1 relay mod 7 duct detectors 6 smoke detectors 8 ceiling speaker strobes. add 29 ceiling speakers 8 smoke detectors 8 duct detectors 11 relay mods 1...
28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors,...
fire sprinkler on 13th & 14th fl. relocate 179 pendent sprinklers on the 13th fl, relocate 183 pendent sprinklers and 2 upright sprinkler on the 14th fl. 13th fl bpa# 202509115078 & 202508112754. 14th...
5th floor. add (1) new 2 way comm. call station at 5th flr. elevator lobby.
16/fl- ti to (e) tenant space to provide spec suite. include non structrual demo of (e) ti and build out of (e) with non structrural partitions doors and sidelites, suspend ceilings, casework and fini...
demo existing sprinkler heads for removal of trash chute. repipe new supply for sprinklers in new trash chute on floors 3,5,7,9,11,13,15,17,19,21,23,25. sprinklers provied by trash chute contractor. (...
unit #42 - rehabilitate existing 1st floor kitchen and 2nd floor bathroom, relocate washer and elec dryer from 1st to 2nd floor of unit. no removal of structural walls.
3/f west bldg: revision to 202509266156 (arch ref 202506189005). demo and revise (e) ductwork and diffusers to accommodate new floor plan layout. furnish and install new duct, diffusers, and terminal...
fire alarm t.i. on 1st flr. add 6 speaker strobes. 2 speakers, 3 duct detectors. 3 control relays for air handling unit (ahu). 202508012119
5th floor. relocate & replace 1) control relay for access control.
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
10th fl: partial floor tenant improvement. demo and construction of offices. conference rooms, restrooms, break room. structural and mep included.
25/fl-relocate 30 pendents, convert 13 pendents to uprights and remove 5 pendents 2025.1230.2947
8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #20251...
10th floor. relocate (9) pendents, (3) uprights, convert (12) pendents to uprights. add (9) concealed pendents, (1) uprights. remove (3) pendents. gcti: 202512313114.
at&t modifications of existing wireless facility consisting of remove & replace 2 antennas; install rf safety signs, stripipings or barricades on rooftop; remove 1 infinity power plant & 8 rectifiers;...