Building Permits in ZIP 94117
San Francisco, CA — 249 permits filed recently
249 permits
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.
re-roofing: remove and reinstall shingle only system on roof, no hot/torch down
unit 3: remodel two bathrooms, one with shower, one with tub, repair plumbing and electrical as necessary, new flooring in hallways.
expansion of (e) closet into garage space. replace (e) two rise steps at rear and propertry line wall. stairs are no more than 30" above grade.
revise p/a 2019-1122-7984 to include document property line locations per parcel map 12532, revise ground floor plan to show the location of the electric meters to be in a 1-hour enclosure in the adja...
reroofing: tear off the roof down to the original sheet and install one ply of certainteed diamond deck synthetic as new underlayment and 40 years asphalt shingles landmark pro. no hot works.
3rd floor work only. opening wall between dining room and hallway, adding ceiling speakers, interior remodel only, not adding square footage. opening wall between master bedroom and living room. no pl...
selective demo on 1st floor & basement. new interior partition on 1st floor, (n) lighting in basement & 1st flr, (n) shelving @ ground flr, 2 (n) communicating openings. new stair to the basement. ref...
to obtain final inspection for work approved under pa#'s 201911227984, 202104229143, and 202009103909. all work is complete.
voluntary structural strengthing at ground floor, 5/8th tr bolts 7" embedment, 32'oc spacing 1/2" structural 1 plywood nailed at 6'edge 12' field.
to obtain final inspection for work approved under pa 202009023332. all work is complete.
to comply with nov 202652593, replace back egress stairs with new, like for like
comply with nov #202542112 & 2025-08690enf. fence at the front of the property will be rebuilt to original appearance. revision to bpa # 202508213637.
apt a kicthen andbathroom remodel in kind. install new kicthen cabinet and toilet.
upgrading type 1 hood system, ductwork and fan for safety and efficiency and replace with new.
structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
remodel kitchen & 1 bathroom.
remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.
pour (n) curb over (e) iron girder to connect with (e) curb and install waterproofing materials at storefront beneath windows