Building Permits in ZIP 94127
San Francisco, CA — 216 permits filed recently
216 permits
to obtain final inspection for work approved under pa# 202305167900, 202312011817, 202406174613. all work is complete.
to obtain final inspection for work approved under pa# 202411255654 and 202412247364. all work is complete.
relocate kitchen & bathroom on 1st floor, remove 2 interior walls on 1st floor. no exterior changes
revision to pa#202506269504. primary bathroom at 2nd floor remodel to include infill one door and relocate vanity
placement of new retaining wall at rear of property to replace existing.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replace 3 street facing windows on the 2nd floor, double panel, double hung wood with exterior aluminum clading and same simulated lites. u<=0.28
replace 21 windows with the same size and style. front windows will be fiberglass material.
revision 202511179730 to include structrual details
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replace 2 windows non street visible at the rear and side. existing vinyl - 1x casement 1x fixed. new fibrex - 1x double hung 1x fixed windows will be in the same opening.no size change u-factor <.27
kitchen/dining room remodel. remove wall to make combined kitchen and dining room. alter double doors to align with center of sitting room. kitchen layout to remain the same.
convert (e) storage space of 539 sq.ft. to living area at the basement level. partial garage conversion of 288 sq.ft to living area at g/f. infill lightwell of 36 sq.ft at the upper level. install new...
to obtain a final inspection for work approved under pa # 2024-0724-7168. all work is complete.
revision to pa #202508072495. staircase is originally brick, but want to change material to stone.
revision to pa 202601073365: revise scope of work to omit bathroom remodel in kind. scope of work to be kitchen remodel in kind only per pa 202601073365. no change to floor layout. no change to wall l...
revision to pa # 2022-0809-0182 & 2025-0410-4171: revise entire 3rd fl layout. new 3' tall fence at front setback.
front building: partial kitchen remodel in kind - replace (e) kitchen counter top and sink in kind. no change to floor layout. no change to wall layout. no structural work.
reroofing: remove (e) roof material and dispose of all debris. install certainteed glasbase base sheet over prepared deck surface. install certainteed flintastic sta smooth interply using torch applic...