Building Permits in ZIP 94133
San Francisco, CA — 205 permits filed recently
205 permits
seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has be...
reroofing: remove 21 squares of roof and install 3ply torch system gta granulated modified bitumen. hot work included.
unit 4: existing non bearing portion of wall between kitchen and dining room to be removed.
exterior stairs less than 50% repair, new wood in kind, non-street facing.
1st flr: convert (e) kitchen to masterbedroom w/full bath. relocate kitchen to living room. relocate half bath and narrow (e) interior stair from 45" to 36" & build counter above. lower flr: add full...
remodel 2 bath, add one bath & one half-bathroom;install dropped ceilings for(n)lighting fixtures;replace wall mounted old gas heaters(n)mini-split hvac system,replace(e) single pane windows with new...
installation of an automatic fire alarm system for a new sprinkled "m" occupancygrocery store. scope includes full notification coverage, delayed egress, and sprinkler monitoring.
ground floor: deferred mep to pa #202508294258
g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use
reroofing no hot works
reroofing: remove (e) roofing down to the sheathing board and the surface will be cleaned. install one ply of app base membrane with roofing nails down. install second ply of certainteed torch down ro...
roof deck
refresh unit# f-110 w/ (n) flr @ 1st floor, remodel kitchen w/(n) caninets & appliances. (n) led lights in lieu of incondescent, replace (e) elec panel w/ (n) code compliant. no structural changes.
interior remodel and alteration to (e) ground floor commerical space. (e) hair salon and proposed (n) dental office to the public per sf planning sec 812. install (n) partitions to create dental offic...
mandatory soft story retrofit on the ground fl per 2025 sfebc. add plywood shear walls on the ground fl.
revision to pa #202601093577, remove 3 outdoor pull stations.
voluntary soft story retrofit to comply with sf ab-094 (per asce 7-16)/chapter 4d per 2022 cebc appendix a-4 standards.there are (3)target stories given the slope of the site.lateral system to consist...
2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite.
renovation of e bar into new restaurant. project includes new plumbing and equipment. no structural work or electrical work.
erect a 7 foot steel swinging security gate inside of building not visible from street.