Building Permits in ZIP 94133
San Francisco, CA — 212 permits filed recently
212 permits
revision to pa# 202312132402 (as-builts), to include (e) waterflow and (e) tamper switch included in the operation matrix per fire inspector.
interior remodel includes:installation of new non-load bearing partition to create a closet, one new interior door & addition of stair guard- railing. no structural work. no exterior work. ces: nov #2...
fire/water damage repair in kind. demo of wall board & insulation on 2nd/3rd fl on adjacent south wall due to water damage, reinstall insulation plywood & 5/8" gyp-x sheetrock (interior only)
administrative permit only: admin approval for components and performance at panel located at 2310 powell and 260 bay st which is interconnected with the panel for 2390 stockton/265 northpoint. see fi...
back unit: all interior work, all in kind replacement, no structural work. remodel kitchen and 3 baths. replace 9 interior doors, 5 windows (rear, not street visible), patch repair smooth walls and ce...
replace (e) fire alarm system 1 for 1 installing 1 es-200xp , 16 sd365, 7 dnr, sd365r, dst - x-, 6 bg-rlx, 14 crf-300, 2 mdf-300, 2 mmf -300
to obtain final inspection for work approved under 202311019917. all work is complete
new roof deck for unit 6 only
to obtain final inspection for work approved under pa#202311019917 all work is complete.
to obtain final inspection for work approved under pa#202311019922 all work is complete.
remove (e) tile floor & replace with new tiles, replace (e) appliances after flooring work. plumbing work to re-connect appliances.
6th fl/ addition to existing 6th floor fire alarm system. provide 5 new notification appliances as shown on these plans ref#2025-1114-9634
2nd fl, ste 250 deferred mep for pa 202509084793
level 1 and level 2: suites 100 and 200. deferred mep for 202509084794
3rd floor: t.i. includes adding 1 horn strobe and 9 strobe lights to an existing fire alarm system. ref #201908138650
ste 300 - deferred mep to 202511240285
removal of e fire hose cabinets, floors 1-7. e gr fl exterior standpipes will be remain in place with caps welded in place to ensure they are never used again. infill wall openings at removed fire hos...
install (1) 6" fire service supply into building. install (2) fire department connections, one at columbus ave gate and one at jackson st gate.design and install automatic wet fire sprinkler system th...
dry rot repair for unit# 4 & unit# 2. bedroom (unit# 4). toilet / half bath at unit# 2. painting & repair.
revision to #202601133746, remove and replace 18 windows, in kind, same size, location, opening and material (aluminum), 2 windows facing the street. uf<=0.27