Spring Scaffolding Llc
Permits (781)
The pipe scaffold top of the sidewalk shed ( permit by other) to the setbacks to the 19th floor setback at west and south elevation broadway.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at building face at west 139th street elevation
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the building face at west 139th street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the building face at the west 142nd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at building face at west 143rd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans, sidewalk shed shall comply with chapter # 33 of the code 2014, no cganges in use egress or occupancy under this application.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed custom color shed at west 15th street, west 16th street, and the east neighb...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at west 15th street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 40 haven avenue.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the building face at the west 142nd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed is at adam clayton powell blvd in front of the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at adam clayton powell blvd in front of the building.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at clinton avenue, east 180th street, oakland place elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at west 144th street front of the building.
Installation of temporary plywood fence & bracing as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed. the bracing connected to the sidewalk shed.