Spring Scaffolding Llc
Permits (781)
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
Pipe scaffold proposed installation of pipe scaffold as per plan. no change in use,egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at west 168t st and west 168th st, main entrance and over the east mechanical units.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed front of the building.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.. the sidewalk shed is in front of the building.
Pipe scaffold proposed installation of pipe scaffold as per plan. no change in use,egress or occupancy.
Installation of tempopary plywood enclosure as per plan. no change in use,egress or occupancy. the plywood enclosure on street away 4 from the building facade. the dot permit filed by others.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at the south elevation on east 16th street front of the building.
Installation of temporary custom coloroverhead protection / sidewalk shed as per plan. no change in use, egress, or occupancy
Equipment use: single 6436# capacity personnel/material hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicat...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. there is no change in use, egress,, or occupancy under this application. the sidewalk...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or the sidewalk shed is front of the building at 5 avenue elevation.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at maiden lane, william street, and john street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is in front of the building at east 4th street.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is at 80th street elevation.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at 81st street elevation.