Spring Scaffolding Llc
Permits (781)
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary construction barriers with chain link fence as per plan. no change in use, egress or occupancy. the construction barriers with chain link fence located in front of building b...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the highline (west) elevation west 13rd street elevation.
Installation of temporary plywood fence & bracing as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed. the bracing connected to the sidewalk shed.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at adam clayton powell blvd in front of the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed is at adam clayton powell blvd in front of the building.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at west 144th street front of the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed at adam clayton powell blvd and west 144th street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at adam clayton blvd and 143rd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west elevation in front of the building adam clayton powell jr blvd elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west elevation in front of the building at adam clayton powell jr blvd.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west 144th street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west 143rd street elevation.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at william street and north neighbor plaza.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancythe sidewalk shed is at west 142nd street, front of the building elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed along the front of the building and the backyard of the building and courtyard.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the front of the building, back of the building, and courtyard.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at the west 141st street elevation, the back of the building, and on both sides of the...
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancythe sidewalk shed is at west 143rd street and adama clayton powell blvd elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.