Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west 143rd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at adam clayton blvd and 143rd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at west 144th street front of the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed is at adam clayton powell blvd in front of the building.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the highline (west) elevation west 13rd street elevation.
Installation of temporary construction barriers with chain link fence as per plan. no change in use, egress or occupancy. the construction barriers with chain link fence located in front of building b...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the piep scaffold of the top of the sidewalk shed at wosster st and spring st elevations.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. there is no change in use, egress,, or occupancy under this application. the sidewalk...
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is in front of the building at east 4th street.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed front of the building.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancythe sidewalk shed is at west 143rd street and adama clayton powell blvd elevations.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Sidewalk shed to be installed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the east 158th street elevation.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or the sidewalk shed is front of the building at 5 avenue elevation.
Installation of temporary plywood fence & bracing as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed. the bracing connected to the sidewalk shed.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 92nd street entrance and all around the building.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at maiden lane, william street, and john street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
Equipment use: single 6436# capacity personnel/material hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicat...