Spring Scaffolding Llc
Permits (781)
Installation of temporary plywood fence & bracing as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed. the bracing connected to the sidewalk shed.
Installation of temporary custom coloroverhead protection / sidewalk shed as per plan. no change in use, egress, or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the east 158th street elevation.
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancythe sidewalk shed is at west 143rd street and adama clayton powell blvd elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 80th street elevation.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is front of the building, 81st street and 34th avenue elevations.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at maiden lane, william street, and john street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 91st street entrance and all around the building.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. there is no change in use, egress,, or occupancy under this application. the sidewalk...
Equipment use: single 6436# capacity personnel/material hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicat...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy the sidewalk shed is at pierrepont street front of the building elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at clinton avenue, east 180th street, oakland place elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west elevation in front of the building at adam clayton powell jr blvd.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at william street and north neighbor plaza.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is at 80th street elevation.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed front of the building.