Spring Scaffolding Llc
Permits (781)
Installation of temporary plywood fence as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancythe sidewalk shed is at west 143rd street and adama clayton powell blvd elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the east 158th street elevation.
Installation of temporary plywood fence & bracing as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed. the bracing connected to the sidewalk shed.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at the south elevation on east 16th street front of the building.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of tempopary plywood enclosure as per plan. no change in use,egress or occupancy. the plywood enclosure on street away 4 from the building facade. the dot permit filed by others.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. the sidewalk shed is at...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the piep scaffold of the top of the sidewalk shed at wosster st and spring st elevations.
Installation of sidewalk shed as indicated on the attached drawnings. There are no changes in use, egeress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed on the sidewalk and driveway.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 91st street entrance and all around the building.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west elevation in front of the building at adam clayton powell jr blvd.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at clinton avenue, east 180th street, oakland place elevations.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is at 80th street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
The plywood fence at the west (street) elevation from the ground attached to the sidewalk shed to past the 3rd floor slab.
Insta of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed columns will be placed on the roadway and permitted at dot at jerome ave elev. front of...