Remove existing floor framing to install new steel beam, lift replacement outdoor equipment steel dunnage as shown.
Demolish and construct interior partitions, ceilings and doors in basement, 1st and 2nd floor
Modify mechanical ductwork along with a/c unit
Herewith Fling Modifications to existing Mechanical system as per plan submitted and in conjunction with interior renovations. No Change in Use, Egress or Occupancy is proposed und…
Herewith Filing Interior Renovations at 1st and 2nd Floors as outlined in plans.
Herewith Filing Structural Modification as per plans a small portion of the 2nd floor slab is being reinforced to support AHU. No Change in Use, Egress or Occupancy is proposed und…
Additons/modifications to existing mechanical systems as per plans filed herewith. no change to use, egress or occuapancy
Tang Temp Egress. Mechanical work as per plans.
Tang wing temp egress. construction of temporary structures in order to maintain the existing occupancy and egress of the building during the demolition of the existing t wing (lil…
Infill of the plaza fountains; new waterproofing and stone pavers as shown on drawings. No change in use, egress or occupancy.
Structural work related to column reinforcement on floors 19 -24 as per plans. Interior work only. No change to use, egress, or occupancy.
Nypl sasb rose main reading room -the project consists of replacing three air handling units and associated steam heating coils and humidification in kind.
Structural work to accommodate the new building including structural system comprises of steel braced frames. the gravity loads of the building are mostlytransferred by a concrete…
Mechanical work as shown on plans filed herewith.
General construction filed for demolition of non-bearing interior partitions and finishes as shown on plans filed herewith. No change in use, egress, or occupancy.
Structural work as shown on plans filed herewith.
Mechanical modifications taking place on floors cel, 1-18, 21 as per drawings filed herewith. no change in use, egress or occupancy.
Construct a new building on the New York Presbyterian Hospital campus, ambulatory care facility 16 stories plus cellar and bulkheads.
General construction modifications taking place in the cellar, 1st floor, 2nd floor, 3rd floor, as per drawings filed herewith. no change in use, egress or occupancy.